Sustainability - On track for a greener tomorrow
READ TIME
1 minute

In 2020 we explored the idea of transporting our aggregate for a contract in Manchester via rail instead of road, recognising the potential to drastically reduce the job’s carbon footprint (one of our major goals as a business).

There were three possible options. The first two involved hauling the stone by road via either a 24 tonnes or 28 tonnes capacity. The third option was hauling the aggregate via rail freight. By calculating the vehicle consumption and total vehicle movements, we discovered that it was a lot more environmentally friendly to transport the aggregate via rail. On top of the obvious carbon reduction, there’d also be a massive reduction in vehicle movements on the road, resulting in less congestion and strain on an increasingly busy road network.

On the back of impressive results, we’re looking to replicate this on as many other contracts as possible.

Statistics
Back to Case Studies

Related stories

Keith Brett MinstLM , Contracts Director of Kiely Bros. Ltd has taken over as Chair of the Road Surface Treatments Association in April 2022.

Mr Brett has been involved with the RSTA since its inception, serving for many years. He is currently Sector […]

Read More
Statement from Kiely Bros on new ALARM Survey

The publication of the Asphalt Industry Alliance’s 30th #ALARM survey once again highlights the ongoing challenges facing the local […]

Read More
Kiely Group meet Parliamentarians to discuss the need to prevent potholes
Read More
Daily Mail
Read More
1 2 3 6
Stay Connected
Website designed by Matrix
arrow-uparrow-left linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram