A Black Country Route
READ TIME
1 minute

In conjunction with Walsall and Wolverhampton LAs. Following the success of a trial scheme in 2018, further works were commissioned for 2020.

The key services focus around the project was use of KIELYlock and our white lining services.

Firstly, a programme of patching and crack sealing was undertaken to best prepare the carriageway for the work to be undertaken.

The carriageway was then surface dressed using a 14/6mm double dressing. The site was then subject to aftercare sweeping for the next 7 days.

Shortly after, the KIELYlock process was applied and the white lining reinstated under the same road closure, completing 50,000 square metres in a single day.

Back to Case Studies

Related stories

Stay Connected
Website designed by Matrix
arrow-uparrow-left linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram